fbpx

INFRASTRUCTURE

Home / 3 Pillars / Infrastructure

WATER TREATMENT PLANT

As the true source of life in any community heavily depends on clean water, Jababeka places as top importance the provision of clean water. Clean water for the industrial estate and drinking water for community is treated and supplied by two water treatment plant units with a combined capacity of more than 60,000 cubic meters per day, which is expandable to nearly 80,000 cubic meters, wholly owned and managed by subsidiary Jababeka Infrastruktur.

For more information: Jababeka Infrastruktur

Waste Water Treatment Plant

Kota Jababeka completed with two waste water treatment plants, with a combined capacity of nearly 35,000 cubic meters per day (expandable to 42,000 cubic meters), wholly owned and managed by subsidiary Jababeka Infrastruktur, which treat the waste water from the tenants in the industrial estate.

As a commitment of Jababeka in supporting a green and environmental friendly industrial estate, Jababeka was awarded Green Level PROPER Award from The Government of Indonesia Ministry of Environment in 2009 and 2011.

For more information: Jababeka Infrastruktur

Power Plant

In order to augment power requirements from the industrial estate and surroundings, Jababeka embarked on a 130MW Power Plant, operated and managed by wholly owned subsidiary PT Bekasi Power. Jababeka has looked in the future and realized power demand will keep growing, which is why enough space for a second 130MW power plant is available.

The Power Plant consists of two state-of-the-art frame 6B gas turbines, manufactured by General Electric Energy with an installed capacity of 40 – 42 MW each by ISO rating. Furthermore, there are two heat recovery steam generators (HRSG) from Thermax Babcock and Wilcox Limited. The combined cycle is completed by a steam turbine from Shin Nippon with a capacity of 46 – 50 MW, which is driven by pressurized high temperature steam from both HRSGs that are fired by using the exhaust gasses from the gas turbines. The total installed capacity amounts to 130MW and is planning to double its capacity to 2 x 130MW in the coming years.

A Joint Operation Agreement between PLN and Bekasi Power allows Bekasi Power to not only enhance Kota Jababeka’s electricity and energy infrastructure by providing specialized services to industrial customers, but also directly support PLN’s mission to strengthen its electricity system, especially in the Bekasi and Karawang industrial areas.

With international standard equipment and redundant gas supply, Bekasi Power ensures an Uninterruptible Power Supply (UPS) at a competitive price that would help support Indonesia’s national power grid and industrial growth for years to come.

For more information:
Bekasi Power Office
Jl. Tekno 8
Kawasan Industri Gerbang Teknologi
Cikarang, Kota Jababeka, Bekasi 17550
Jawa Barat, Indonesia
Ph. 62 21 8984 2690 / 8984 2698
Fax. 62 21 8984 2699
Email. csbp@jababeka.com

Cikarang Dry Port

Cikarang Dry Port is strategically located in Jababeka Industrial Estate, which lies in the heart of the biggest manufacturing zone of west Java, as well as the country, home to a dozen Industrial Estates with more than 2,500 industrial companies, both multinationals and small and medium enterprises (SME).

Cikarang Dry Port provides Integrated Port and Logistics facilities and serves as an extension of Tanjung Priok International Seaport. Cikarang Dry Port started operations in 2010 and lies strategically located in the heart of the largest manufacturing zone of Indonesia along the Bekasi-Cikampek industrial corridor, east of Greater Jakarta. Approximately 200 hectares are allocated for the Dry port which is easily accessible by highway and railway system.

Cikarang Dry Port offers a one stop service for cargo handling and a logistics solution for international export and import, as well as domestic distribution. It provides integrated port and logistics services with dozens of logistics and supply chain players, such as exporters, importers, carriers, terminal operators, container freight station, bonded warehouse, transportation, third party logistics (3PL), empty container depot, as well as banks and other supporting facilities.

Cikarang Dry Port is the first and only Integrated Customs Services Zone in Indonesia and has been allocated the international port code IDJBK, which connects Cikarang Dry Port to other ports of call around the world and designates it as Port of Origin and Port of Destination.

Cikarang Dry Port is the suitable place for your supply chain activities – bringing all parties in one place for better coordination and increased productivity.

For more information: Cikarang Dry Port

Estate Management

Beside Water and Waste Water Treatment Plant, Jababeka also provides network of fiber optics with capacity up to 10 Gigabit/s powered by PT Telkom Indonesia, PT Indonesia Comnet Plus (Icon+) & PT Indosat. Public Switched Telephone Network (PSTN) supply by PT Telkom Indonesia with a capacity of 25,000 lines provides services to businesses and individuals.

Jababeka has invested in quality road improvement and drainage services program, an in-house fire brigade and fire hydrants, 24-hour security, public lighting and public transportation, all of which fall under Jababeka’s estate management services.

The Cikarang Committee of Society Empowerment and Service (LPPM-C), which is part of the estate management team, has developed social responsibility programs and is committed to developing a positive synergy and create partnerships between companies and other entities inside and outside Kota Jababeka in order to develop and improve the quality of life and the integrity of its society. LPPM-C is similar to an administrative government or city council that has the power to bind relationships and serve the best interests of the industrial and other communities in and surrounding Kota Jababeka. They are making improvements in long-term security, economic and community development, image and the general welfare of companies, the community and society as a whole.

For more information: Jababeka Infrastruktur